CONTACT |
EMPLOYER |
ENGINEER |
LOCATION |
BRIEF DESCRIPTION OF WORKS
|
DATE |
Eugene Daly
01~2876319 |
Laois Co Council |
Eugene Daly & Associates |
Ballyroan Water Supply
Augmentation Scheme
Co Laois |
Starter steel casing 12”dia, completed depth 97metres 5” uPVC screen/casing, grout seal by tremie pipe injection. |
July 2010 |
Gerry Baker
01~2914800 |
Wicklow Co Council |
PH McCarthy
Consulting Engineers
(White, Young Green) |
Arklow Water Supply Scheme
Arklow |
Simultaneous drilling and casing method drilling gravels/unconsolidated materials for a total of 5 No Production Wells up to 20metres.
Provide and install uPVC casing 260 (O.D) connected to Johnson stainless steel screen (273mm O.D). |
Jan –Mar 2009 |
Henning Moe
01~6722700 |
Boston Scientific
Corporation (BSC),
Galway |
CDM Ireland Ltd |
Galway |
3 No exploration boreholes to probe groundwater potential on BSC site. |
Dec 2010 |
David Ball
01~4053925 |
Abbott Ireland
Pharmaceuticals Operations |
David Ball |
Sligo |
Exploration drilling and well development. Also Decommissioning of test wells to approved specification |
Dec 2010 |
John Sunderland
01~8867012 |
Private Client |
Cunningham Lindsey
Loss Adjusters |
Navan,
Co Meath |
Replacement high specification grout sealed domestic well due to kerosene contamination of existing well |
Oct 2010 |
David Ball
01~4053925 |
Limerick Co Council |
David Ball |
Carrigkerry,
Co Limerick |
12” dia symmetrix drilling through unconsolidated gravels up to 15mtrs. Thereafter proceeded to drill by Down Hole Hammer from 15metres bgl to target depth in black shale bedrock. Supply & fit 8” uPVC grout seal and retrieval of 12” symmetrix temporary casing. |
July 2010 |
Pat English
(Harrington’s Quarry)
094~9367072 |
Harrington Concrete Quarry, Kilkelly |
SLR Consulting |
Turlough,
Co Mayo |
Exploration drilling / monitoring drilling |
Jan 2011 |
Fergus Gallagher
01~8026391 |
Kilsaran Concrete |
Michael Gill
Hydro-Environmental |
Kilmessan |
Exploration drilling and well development of pumping wells |
Nov 2010 |
CONTACT |
EMPLOYER |
ENGINEER |
LOCATION |
BRIEF DESCRIPTION OF WORKS
|
DATE |
Eugene Daly
01~2876319 |
Kildare Co Council
(National Roads Authority) |
Oliver Higgins
Eugene Daly & Associates |
Irish National Stud |
Drilling 4 No test wells by Symmetrix through alluvial silts and gravels. Follow on phase drilling of 2 No Production wells with starter casing @ 16”dia, drilling by Reverse Circulation. Thereafter installation of 10”dia stainless steel / mild steel casing. Sanitary seal finish by tremie pipe injection method. Well development. Fully self contained drilling discharge system. |
2010 |
Peter Kelly
066~7123404 |
Cadbury Ireland |
Malachy Walsh
& Partners |
Rathmore
Co Kerry |
Test Well drilling to target depth excess 160metres also well testing and comprehensive water analysis. |
Oct 2010 |
Pamela Bartley
087 8072744 |
Jepp Ltd |
Hydro G |
Kinnegad
Co Meath |
Exploration drilling to prove excess 60m 3/day for Commercial Planning Application. |
Feb 2010 |
Peter Oliver Loughnane
047~87107 |
Truagh Group Water Scheme |
T.J. O’Connor
Consulting Engineers |
Lough Gore
Greagh
Co Monaghan |
Drilling test well and subsequent Production Well to a completed depth 112mtr installing 8” uPVC screen/casing and grout seal by tremie pipe injection method. Works also included 7 day well testing and monitoring of local wells. |
April 2011 |
Peter Conroy
061~374956 |
Sligo Co Council |
Peter O’Connor
Robert Meehan
(Hydrogeologists) |
Grange
Co Sligo |
North Sligo Raw Water Supply
Exploration drilling and testing |
May 2011 |
Thomas Campbell
096~9630301 |
MEIC D.B.O
Main Contractor |
Thomas Campbell
Engineer
(MEIC/Glan Aqua)
Pamela Bartley
Hydrogeologist) |
Galway/Roscommon
Group Water Schemes |
Kilternan GWS: Production well 8” uPVC screen/casing, completed to target depth 52mtrs. Injected grout seal by tremie pipe method.
Barnaderg GWS: Production well 10” uPVC (I.D.) screen/casing, completed to target depth 62mtr. Injected grout seal by tremie pipe method.
Leacarrow GWS: Production well 10” (I.D.) uPVC screen/casing, completed to target depth 110mtr, Injected grout seal by tremie pipe injection method.
Attiregan GWS: Production well 10” uPVC screen/casing, completed to target depth 82mtr, Injected grout seal by tremie pipe injection method. |
2010 / 2011 |
CONTACT |
EMPLOYER |
ENGINEER |
LOCATION |
BRIEF DESCRIPTION OF WORKS
|
DATE |
Joe Sherran
01~2969416 |
John Paul Construction |
Andre Geyser
John Paul Construction |
Private Hospital
Dublin |
Sealing of 2 No Artesian boreholes at basement (– 2 nd floor )level.Methodology included injection of ordinary portland cement to prescribed specific gravity with flange fitting on 2 nd of 2 wells to contain discharging grout returns to surface |
Jan 2010 |
Oliver Higgins
01~2964667 |
Laois Co Council |
SLR
Consulting Engineers |
Graiguecullen
Co Laois |
Drilling 2 No Production Wells by Reverse Circulation drilling 14 ¾” dia to target depth 72.5metres. Top hole section steel cased @ 18”dia. Supply & install 10” dia Johnson stainless steel casing, pea gravel at annulus to screen and grouted from below competent bedrock (25m) to surface by tremie pipe injection method. |
Dec 2009 |
John Clancy
045~846176 |
IGSL |
IGSL |
M20, Cork |
M20 Motorway Service Area Water Well, 8” dia openhole to 100mtr, 5” uPVC screen/casing, sanitary seal/grout band by tremie pipe injection method. |
June 2009 |
David Ball
01~4053952 |
Richard Quirke
Turnpike Casino
Co Tipperary |
Brian O’Connell
& Assoc, (Archt)
John Rooney
Fearon, Rooney, O’Neill. ( Engrs) |
Turnpike
Co Tipperary
Proposed Casino development |
Exploration drilling and subsequent development of test well to Production Well status including grouting by tremie pipe injection method |
Aug 2009
Feb 2010 |
Henning Moe
01~6722700 |
Environmental Protection Agency |
CDM Consulting Engineers |
Various;
Donegal
Mayo
Kilkenny
Cork
Louth
Galway |
Groundwater Works Programme, EPA initiative to establish poorly productive Aquifer catchments around Ireland. This involved drilling well clusters sealed by tremie pipe injection method under strict supervision to ensure no cross contamination between adjacent wells at varying discrete depths. Each site comprised a sloping transect between a recharge area (high-up in the Catchment)and a discharge area (near streams, lakes etc., ) |
2008-2010 |